Skip to main content

Project History


Cable Protection
Caption: Cable Protection

This section contains a listing of the projects with a short summary report which can be accessed by via hyperlink. Most of the projects have a completion report written by FP0-1 staff members. Each of those reports were digitized by the Defense Technology Information Center (DTIC) and now available through that organization. For those projects that have a completion report written, links are provided. Additional reports can be located on the DTIC website at: https:// discover.dtic.mil

Over time, as other project reports become available, this section will be updated with new reports. The following reports are being researched and will be added as they are completed:

  • BARSTUR Cable Installations and Repair 
  • Southern California Acoustic Range (86-88)
  • Combined Surface Ship and Submarine Radiated Noise Measurement (CSSSRNM) Array (87)

If you have documentation, reports or summaries of related projects, please email them to: NHHC-USNSMreference@us.navy.mil

************************

A

AFAR Cable Landing

AFAR Cable Repairs 72 & 74

AFAR Test Launch AUTEC

Antarctic Ice Pier

Arctic Submarine Laboratory Support- Arctic West

Arctic Table of Allowance (TOA)

AUTEC Noise Measurement Array Repair

 

C

Charleston Tactical Air Combat Training System (CTACTS)

Classic Thicket

 

D

Deperming Facilities

Diego Garcia Diving Support Operations

Diego Garcia POL Pier Moorings 1979

Diego Garcia POL Pipeline

 

E

Eager - Walt Eager Interview

East Coast Air Combat Maneuvering Range (ACMR)

 

F

Fleet Mooring Installation: Diego Garcia 1981

Fleet Moorings: Guam

Fort Lauderdale Cable Repair/Install 77

 

I

ICEX 1979

 

L

Large Suspended Cable Structures – SEACON II

Lighthouse Automation & Modernization Program

Linear Chair

 

M

Marine Geotechnical Engineering Handbook

Mooring Inspections

 

N

Nuclear Power Training Unit Mooring Charleston

 

O

Offshore Petroleum Discharge System

OPNAV Instruction 5450.182 dtd 12 October 1970

Osborn - Jim Osborn Interview

 

P

Proceedings of Naval Facilities Engineering Command Ocean Engineering Conference September 1969

Project Tektite - AD0773351 and AD702060

 

R

Report on Study Topic 68-1: Plan for Definition of NAVFAC/NCF Role in Ocean Engineering

S

SEALAB

SEACON I - Ocean Construction Platform

Seafloor Construction Experiment  - SEACON II

Seafloor Cable Protection Office

Sewer Outfalls

SOSUS Cable Landing, Repair and Maintenance

SOUTH TOTO ACOUSTIC MEASUREMENT FACILITY (STAFAC)

Southern California Acoustic Range (SOAR) 84

Squaw Mooring

St. Croix Fleet Mooring

St. Croix FORACS Installation

St. Croix Underwater Tracking Range Repair/Upgrade

St. Croix Underwater Tracking Range Expansion

 

T

Travis Hyperbaric Chamber

W

Waterborne Intrusion Detection System (WIDS)

Published: Fri Apr 05 08:22:00 EDT 2024