USS Constitution FY 2015–2017 Restoration Highlights
Naval History and Heritage Command, Detachment Boston
The drawing provides a sense of the dry-dock setup for USS Constitution.
- Down-rig USS Constitution and prepare Dry Dock#1, Charlestown Navy Yard, Boston Historical Park
- Dry Dock USS Constitution and install support shoring and scaffolding
- Remove copper sheathing, lower hull of Constitution
- Remove lower hull caulking
- Remove and replace hull planks
- Inspect and restore cutwater (bow of Constitution)
- Caulk hull planking
- Install new copper sheathing on lower hull
- Undock and refloat USS Constitution and re-rig
Published: Fri Dec 08 14:20:05 EST 2017