Skip to main content
Related Content
Topic
  • Boats-Ships--Nuclear Powered
  • Aviation
  • Boats-Ships--Submarine
Document Type
  • Ship History
Wars & Conflicts
File Formats
  • Image (gif, jpg, tiff)
Location of Archival Materials

Sunfish II (SSN-649)

1969-1997


Image related to Sunfish II
Caption: USS Sunfish (SSN-649) on trials, early in 1969. Designed for optimum submerged performance, modern nuclear-powered submarines are more at home in the depths than on the surface.

A plectograth marine fish, Mola Mola, having a deep body truncated behind, and high dorsal and anal fins.

II

(SSN-649: displacement 3,860 (surfaced), 4,630 (submerged) ; length 292'; beam 32'; draft 29'0"; speed 20+ knots; complement 107; armament 4 21-inch torpedo tubes, SUBROC; class Sturgeon)

The second Sunfish (SSN-649) was laid down on 15 January 1965 at Quincy, Mass. by the General Dynamics Corp.; launched on 14 October 1966; sponsored by Mrs. Robert C. Byrd; and commissioned on 15 March 1969, Cmdr. Richard L. Thompson in command.

Sunfish spent the period from April to August undergoing shakedown, and in various exercises such as torpedo firing, sound trials, control drills, and casualty drills. A short dependents' cruise in late August was followed by post-shakedown availability at Groton, Conn. The last two weeks of 1969 were devoted to a leave and recreation period for the crew. Early 1970 was spent in upkeep periods and several short cruises in preparation for an extended deployment. The submarine was deployed from 16 June to 26 August when she arrived at Charleston, S.C., and again from 6 October to 1 December 1970.

Sunfish put to sea on 22 January 1971 to participate in a short fleet exercise, but operational commitments were changed and she did not return to port until 9 March. The ship made a cruise to Port Everglades, Fla., in April which was followed by a fleet exercise. The remainder of the year was spent participating in antisubmarine warfare exercises with destroyers and patrol aircraft.

Sunfish departed Charleston, on 3 January 1972, for the Mediterranean and a tour of duty with the 6th Fleet. She returned to her homeport on 21 May and entered a stand-down period that lasted until early October when she entered the Norfolk Naval Shipyard for her first major overhaul. The overhaul was completed in August 1973, and the submarine sailed to New London for refresher training. She touched at Charleston in early November and continued to the Caribbean for sound training and weapon systems tests.

Sunfish returned to Charleston on 9 December 1973 for a leave and upkeep period. She operated along the east coast from New London to Cape Kennedy until June 1974. On 25 June, Sunfish stood out of Charleston to begin a period of deployment. 

Decommissioned and stricken from the Naval Vessel Register on 31 March 1997, Sunfirsh was disposed-of, by submarine recycling, on 31 October 1997.

Updated

7 March 2024

Published: Sat Mar 09 13:44:54 EST 2024