Skip to main content
Naval History and Heritage Command

Naval History and Heritage Command

Tags
Related Content
Topic
  • Boats-Ships--Submarine
Document Type
  • Ship History
Wars & Conflicts
File Formats
Location of Archival Materials
G-3
(Submarine No. 31: displacement 360 (surf.), 457 (subm.); length 157'6”; beam 17'6"; draft 10'11"; speed 14 knots (Surf.), 9.5 knots (subm.); complement 24; armament 4 18" torpedo tubes; class G-4)

 

Turbot (Submarine No. 31) was laid down on 30 March 1911 at Bridgeport, Ct., by the Lake Torpedo Boat Co.; renamed G-3 on 17 November 1911; transferred to the New York Navy Yard for completion on 17 November 1913 following the cancellation of the Lake contract; launched on 27 December 1913; and commissioned at the New York Navy Yard on 22 March 1915, Lt. Felix X. Gygax in command.

After fitting out, G-3 proceeded Bridgeport, Ct., on 1 July to have sponsons fitted to the boat to increase stability. During submerged test runs off Port Jefferson in Long Island Sound two weeks later, however, her crew discovered several leaks and the submersible docked at the Lake Co.’s marine railway for repairs and alterations. These modifications, which included work on the main engine oiling system as well as sponson installation, lasted until 8 January 1916. On that date she sailed back to the New York Navy Yard, to be inclined and undergo a deep submergence test. The latter took place off Eaton’s Point, Long Island, on 8 February, with Simon Lake – owner of the Lake Torpedo Boat Co. – embarked. The boat successfully completed a test dive to 198 feet and was preliminarily accepted by the Navy that same day.

On 11 February, G-3 proceeded to New London for initial shakedown operations. Aside from a brief period alongside submarine tender Tonopah (Monitor No.8) to repair damaged screws in March, she spent the next five months conducting trial runs, dive tests and training operations out of New London. Following another yard period at Bridgeport in mid-July, to replace defective lube pumps, the boat moved to New York on 30 August for final acceptance trials. Unfortunately, the breakdown of G-3’s port engine disrupted her standardization trials in late September, prompting her move into the Navy Yard for repairs on 3 October. Difficulties in working in tight engine room spaces necessitated removing the port engine for repair and the boat remained immobile through the following spring. She finally put to sea on 1 June 1917 and returned to New London that same day.

Assigned to Division Two (Training and Experimental Division), Submarine Flotilla, Atlantic Fleet, G-3 combined the training of new student crews in submarine operations and torpedo firing with experimental work as needed. The latter included harbor net defense deployment drills with Fulton (Submarine Tender No.1) in June and stationary dives with a submarine rescue bell in the Thames River in September. In late October, G-3 carried out instructional sound work with Parthenia (SP-671), a task resumed in early 1918 in company with a succession of submarine chasers and patrol boats.

In May 1918, G-3 participated in submarine division maneuvers in Great Salt Pond Bay, including several two to five day cruises at sea. In early June, following warnings of German U-boats off the east coast, G-3 conducted a number of periscope and listening patrols in the region. These operations came to a sudden end on 13 June, when engine and battery trouble forced the boat to sail to New York for spare parts. Returning to New London on 18 June, G-3 underwent an availability at the Thames Shipyard through mid-July.

Resuming school duties on 17 July, G-3 spent the next three months conducting torpedo instruction, listening and radio training for officer and enlisted submarine students. Following an engineering performance cruise to Boston in September, the boat conducted training operations through October. On 10 November, G-3 began preparations for an overhaul at the Submarine Base, New London, which lasted through April 1920. Although she returned to her familiar training and instruction duties in May, the boat was tapped for inactivation on 6 December 1920.

G-3 was decommissioned at New London on 5 May 1921 and towed to the Philadelphia Navy Yard on 17 August 1921. Having been stripped of machinery and fittings, the hulk was sold for scrap to J.G. Hitner on 19 April 1922 and struck from the Naval Vessel Register that same day.

02 February 2004